NATURAL GAS DISTRIBUTION NETWORKS CONSULTANCY COMPLETED PROJECTS
|
|
LINE NO
|
CITY
|
ORGANIZED INDUSTRIAL ZONES
|
REGION REGULATOR STSATION
|
ŞEBEKE UZUNLUĞU
( m )
|
UNIT
|
CAPACITY
( Sm3/h )
|
BASINÇ
|
ENTRANCE
( Barg )
|
EXIT
( Barg )
|
POLYETHYLENE
|
STEEL
|
1
|
KAYSERİ
|
KAYSERİ O.S.B.
|
5
|
12.000
|
12-19
|
4
|
54.697.00
|
11.937.00
|
2
|
TEKİRDAĞ
|
ÇORLU LEATHER O.S.B.
|
3
|
12.000
|
12-19
|
4
|
9.590.00
|
2.004.00
|
3
|
KÜTAHYA
|
KÜTAHYA O.S.B.
|
2
|
10.000
|
12-19
|
4
|
7.541.00
|
584.00
|
4
|
ÇORUM
|
ÇORUM O.S.B.
(1.STEP)
|
2
|
12.000
|
12-19
|
4
|
3.621.00
|
1.652,00
|
5
|
UŞAK
|
UŞAK O.S.B.
|
1
|
12.000
|
12-19
|
4
|
17.698.60
|
3.860.00
|
6
|
KARAMAN
|
KARAMAN O.S.B.
|
2
|
13.000
|
12-19
|
4
|
14.160.00
|
1.864.00
|
7
|
SAMSUN
|
SAMSUN
CENTRE O.S.B.
|
2
|
14.000
|
12-19
|
4
|
9.154.80
|
1.957.40
|
8
|
İSTANBUL
|
TUZLA LEATHER O.S.B.
|
12
|
14.000
|
12-19
|
4
|
11.018,00
|
27.581,00
|
9
|
ANKARA
|
OSTİM O.S.B.
|
2
|
14.000
|
12-19
|
4
|
44.982,50
|
1.289,50
|
10
|
ÇORUM
|
ÇORUM O.S.B.
(2. STEP)
|
2
|
12.000
|
12-19
|
4
|
6.661,36
|
905,50
|
11
|
KOCAELİ
|
GEBZE
PLASTICS O.S.B.
|
3
|
6.000
|
12-19
|
4
|
14.448,00
|
2.552,00
|
12
|
TEKİRDAĞ
|
AVRUPA FREE ZONE (1. STEP)
|
1
|
14.000
|
12-19
|
4
|
1.608,00
|
4.781,00
|
13
|
KARAMAN
|
KARAMAN O.S.B.
(2. AŞAMA)
|
2
|
13.000
|
12-19
|
4
|
9.380,00
|
5.112,00
|
14
|
TEKİRDAĞ
|
ÇERKEZKÖY OSB
(ADDITIONAL PE NETWORK )
|
--
|
--
|
--
|
4
|
2.000,00
|
0,00
|
15
|
KOCAELİ
|
GEBZE
KİMYACILAR O.S.B.
|
2
|
10.000
|
12 -19
|
4
|
12.000,00
|
5.000,00
|
4
|
7.500
|
16
|
KOCAELİ
|
GEBZE
İMES O.S.B.
|
3
|
10.000
|
12 -19
|
4
|
10.700,00
|
2.500,00
|
17
|
SAKARYA
|
HENDEK O.S.B.
|
4
|
5.000
|
12 -19
|
4
|
12.720,00
|
3.612,00
|
18
|
TEKİRDAĞ
|
AVRUPA FREE.
ZONE (2. STEP)
|
1
|
14.000
|
12-19
|
4
|
3.121,00
|
100,00
|
19
|
TEKİRDAĞ
|
ÇERKEZKÖY O.S.B.
(DISPLACED STEEL AND PE NETWORK )
|
-
|
-
|
12-19
|
4
|
1.768,00
|
2.667,00
|
20
|
KOCAELİ
|
TOSB – TAYSAD OSB
(ADDITIONAL STEEL AND PE NETWORK )
|
1
|
15.000
|
12-19
|
4
|
3.718,00
|
1.348,00
|
21
|
KIRKLARELİ
|
KIRKLARELİ O.S.B.
(2. STEP)
|
1
|
12.000
|
12-19
|
4
|
6.786,90
|
60,00
|
22
|
VAN
|
VAN O.S.B
(3. and 4. STEP )
|
2
|
5.000
|
12-19
|
4
|
8.781,00
|
4.192,00
|